GAF product renderingHow It Works
A Clean, Predictable Process —
From Estimate to Final Walkthrough
No skipped steps. No shortcuts. No surprises halfway through. Here's exactly how your Westmark roof replacement happens — and what to expect at each stage.
Get an instant budget estimate in about 60 seconds using aerial roof data — no appointment or sales call required.
The 6-Step Process
Six Steps. Zero Guesswork.
Every project follows the same clear process. You'll always know where you are, what's next, and who to talk to.
1. Instant Estimate
Enter your property address. Aerial-data ballpark estimate in under 60 seconds. No salesperson at your door.
2. Detailed Quote
We pull a precise aerial measurement report and follow up with a written, itemized quote — every line item visible.
3. Schedule the Project
Once you approve the quote, we lock in a specific install date and walk you through what to expect.
4. Tear-Off & Deck Inspection
Crew arrives on time. Full tear-off down to the deck, then we inspect and repair any damaged sheathing before anything goes back on.
5. Complete System Install
Underlayment, leak barriers, starter, field, flashings, ventilation, and ridge — installed end-to-end to manufacturer spec.
6. Final Walkthrough & Cleanup
We walk the finished roof with you, complete a magnetic nail sweep, and register your manufacturer warranty.
Communication
What Communication Actually Looks Like
You'll never wonder what's happening on your project. The whole process is built around clear, written communication — not voicemail tag.
Written Quotes
Every quote is itemized in writing — no verbal pricing, no vague allowances.
One Point of Contact
Same person from quote to final walkthrough. You won't get bounced between departments.
Schedule Confirmation
Install date confirmed in writing with start and finish windows clearly defined.
Day-of Updates
You'll know when the crew arrives, when tear-off is complete, and when the final walkthrough is scheduled.
Warranty Registration
We register your manufacturer warranty as part of project closeout — and send you the documentation.
No Sales Pressure
If you need time to think about it, take the time. We don't do same-day-close pressure tactics.
Ready to start the process?
Begin with the instant estimate — 60 seconds, no phone call required.
What to Expect
What Install Day Actually Looks Like
Most homeowners haven't been through a roof replacement before. Here's what the day actually looks like at the property.
Crew Arrives Early
Crews typically arrive between 7:00–7:30 am to maximize daylight.
Property Protection
Tarps and protective coverings go down on landscaping, A/C units, and any sensitive areas before tear-off.
Tear-Off Begins
Old roof comes off down to the deck. Most homeowners are surprised at how quickly this happens.
Deck Inspection
We walk the deck and flag any damaged sheathing for replacement before underlayment goes down.
Dry-In
Synthetic underlayment and leak barriers go down before the end of day so the home is fully protected overnight if multi-day.
Field Install
Field shingles installed to manufacturer spec — full-day work for asphalt, slightly longer for DaVinci.
Final Cleanup
Magnetic nail sweep across the property, debris removed, dump trailer hauled off-site.
Final Walkthrough
We walk the roof and the property with you before we leave.
No Pressure
What 'No-Pressure' Actually Means at Westmark
Other contractors say it. Here's what it actually looks like in practice.
No Same-Day-Close
We don't sit at your kitchen table waiting for a signature. Take the time you need.
No Mystery Pricing
Quotes are written and itemized. The price you see is the price you pay.
No Spam Follow-Ups
If you ask us to stop following up, we stop. Period.
FAQs
Common Questions