What to Expect

Roof Replacement Timeline —
From Quote to Final Walkthrough

Most full residential roof replacements take 1–3 days of actual install work. Here's the full picture — from instant estimate through completion — so you can plan around it.

Get an instant budget estimate in about 60 seconds using aerial roof data — no appointment or sales call required.

Day 0: Estimate

Step 1 — Instant Estimate

Enter your address. We use precise aerial measurement data to generate a real ballpark in about 60 seconds — no salesperson at your door.

Time Required

About 60 seconds.

What You Get

A real ballpark price based on aerial measurements of your actual roof.

Days 1–3: Detailed Quote

Step 2 — Detailed Quote

Within 24–48 hours of the instant estimate, we follow up with a written, itemized quote — broken down by system tier so you can compare side-by-side.

Time Required

Typically 24–48 hours after instant estimate.

What You Get

A line-item written scope and price by system tier — GAF Timberline HDZ, GAF Grand Sequoia, DaVinci synthetic.

Start the Clock — Get Your Instant Estimate

About 60 seconds. No phone call required.

Request Detailed Quote

Days 3–14: Permit + Schedule

Step 3 — Permit + Material Order + Schedule

Once you approve the scope, we pull permits, order materials, and schedule the install. Typical lead time is 1–3 weeks depending on material availability and your preferred timeline.

Time Required

1–3 weeks typical.

What Happens

Permit pulled, materials ordered and delivered, install date confirmed.

Install Day(s)

Step 4 — Tear-Off, Inspection, Install

Crew arrives on time. Full tear-off, complete deck inspection, full system installation per manufacturer spec. Most projects complete in 1–3 days.

Day 1

Tear-off begins. Existing shingles, flashings, and underlayment removed. Deck inspected.

Day 2

Synthetic underlayment, leak barriers, flashings installed. New shingles or synthetic system installed.

Day 3 (if needed)

Ridge system, ventilation, final flashings, and full site cleanup. Most projects complete by end of Day 2 or Day 3.

Final Day

Step 5 — Final Walkthrough + Warranty Registration

We walk the finished roof with you, confirm everything is right, complete a magnetic site sweep for any nails, and register your manufacturer warranty.

Time Required

Same day as project completion.

What Happens

Walkthrough, final cleanup, warranty registration with GAF or DaVinci.

FAQs

Common Questions

Yes. Most homeowners are. We work around your schedule and there's no need to vacate. The work is on the roof — interior is undisturbed.

We monitor weather closely and won't tear off a roof we can't dry-in the same day. If weather is a concern, we reschedule. Your home is never left exposed overnight.

Depends on material availability and our schedule. Most projects begin within 1–3 weeks of contract signing.

Start with the Instant Estimate

Written quotes, not verbal ranges. Full-system installs, not shortcuts. No pushy sales tactics.

Get an instant budget estimate in about 60 seconds using aerial roof data — no appointment or sales call required.

Or speak with us directly(619) 649-7836